"I have been impressed by the quality of W.G. Wigginton’s work right from the start. They have a good understanding of the work required and the electrical installation has been to a consistently high standard throughout. Tony Owen is a skilled and competent Contracts Manager whose level of detail and commitment to the job means he can be relied upon to complete a first class project. His sites are well managed, clean and tidy with a thoughtfully laid out compound.
Those sites have been reconfigured to apply social distancing measures during the Covid-19 pandemic that again work well with the revised procedures closely followed by the site team.
All Task Orders delivered by W.G. Wigginton for RB Greenwich have been on time and within the Task Price. A feature of this Framework is that we have taken time to properly inspect and survey each block so a bespoke installation can be designed for each block. Prices agreed for each block match that design and in every case, the blocks have been completed to that price and within programme.
A good number of internal works have had to be delayed during the Covid-19 lockdown. Tony re-programmed works to external and common parts to keep the project going and accommodate the concerns of residents. His team of RLOs have been understanding and sensitive to residents’ needs that has helped considerably in gaining access to their homes to complete electrical installations.
I have enjoyed working with Tony and his team. WG Wigginton are a firm who can be relied upon to complete complex M&E installations professionally, on time and within budget.
A firm I recommend without hesitation."
Shane Hughes - Project Manager, Royal Borough of Greenwich
"During a period in excess of 6 years, WG Wigginton have continued to deliver an excellent service showing both professionalism and compassion as well as offering value for money. They have also adopted Barnet Homes’ policy in relation to social values.
Through all stages of the projects undertaken by WG Wigginton every aspect in relation to cost and time have been discussed and are visible.
Wigginton have a rigorous quality and safety regime in place and this is monitored and adhered to by all."
Paul Rose - Senior Project & Contract Manager, London Borough of Barnet
“Excellent company. Highly recommended.”
Chris Mills - Project Manager, Greenwich Council
ㅤ
“WG Wigginton has been an excellent partner in the delivery of our Electrical Rising Mains, Rewire, lighting, Landlord Upgrades and Sheltered Housing Refurbishment programme.
They have continually delivered quality work in difficult time constraints within budget.”
Gavin Bass – Major Works Project Manager, Barnet Homes
ㅤ
“I work with WG Wigginton Ltd as represented by Tony Owen on a Framework to renew Rising & Lateral Mains and communal lighting systems to high rise blocks for the Royal Borough of Greenwich. It is a complex project that requires detailed designs and pre-work investigations to arrive at an informed price and approach.
Tony has an encyclopaedic knowledge of all things electrical with technical skills to match that means he can always be relied upon to offer a sound set of Task Proposals. Moreover, his contract management skills have seen the phases completed by him to date all being on time and within budget that is all the more impressive. Tony has that rare quality of being able to explain quite technical work with residents in a manner that is easily understood by the layperson.
He’s a first rate contracts manager and a pleasure to work with.”
Shane Hughes – Savills (UK) Limited
“WG Wigginton have continually delivered a high standard of work. They have responded positively to any new challenges and liaised with our project team and residents in an extremely professional manner. I would have no doubt in recommending this contractor.”
John Loannou – Electrical Project Manager, Ealing Homes
“Royal Greenwich have been working in partnership with W G Wigginton since early 2019. They are a very pragmatic and proactive organisation and have responded well to our needs. They have consistently delivered programmes on time, to budget with a quality finish. They engage well with residents. All levels of the organization are approachable, professional and organised.
I would highly recommend them.”
Chris Mills – Royal Greenwich